Water Treatment Facility
WASCO installs 60 lb glazed block over 7–8 ft #8 rebar on a Hydro Mobile 64' bridge setup — with the MULE handling the heavy, awkward placements the crew used to dread.

[PROJECT BRIEF]
On the jobsite.
The wall design called for 60 lb glazed block dropped over 7 to 8 ft of #8 rebar, doubled up in nearly every core.
Manually feeding block down that much rebar destroys wall quality and exhausts a crew within hours.
Running multiple MULEs on a Hydro Mobile 64' bridge setup, WASCO spaced units to cover the tallest, most critical rebar zones, leaving the lighter window-and-trim work in the gaps.
Result: the crew focused on quality and alignment instead of wrestling block, and the wall went up cleaner and faster than a traditional manual placement would have allowed.