Water Treatment Plant

Crank-up scaffold deployment on a municipal water treatment plant, pairing the MULE MZ100 with the Ground Base to handle heavy 32" CMU at grade.

Water Treatment Plant
[PROJECT BRIEF]

On the jobsite.

Heavy civil infrastructure jobs demand consistent output on oversized block — exactly where manual placement burns crews out fastest.

Angel Buildings ran the MULE MZ100 on a crank-up scaffold configuration, supplemented by the Ground Base for slab-level work.

The combined setup let a smaller crew maintain steady, high-quality placement across the full lift schedule without the typical late-day productivity drop.