← All projects
PRJ_03/INFRASTRUCTURE
Water Treatment Plant
Crank-up scaffold deployment on a municipal water treatment plant, pairing the MULE MZ100 with the Ground Base to handle heavy 32" CMU at grade.

[PROJECT BRIEF]
On the jobsite.
Heavy civil infrastructure jobs demand consistent output on oversized block — exactly where manual placement burns crews out fastest.
Angel Buildings ran the MULE MZ100 on a crank-up scaffold configuration, supplemented by the Ground Base for slab-level work.
The combined setup let a smaller crew maintain steady, high-quality placement across the full lift schedule without the typical late-day productivity drop.
[FIELD IMAGERY]
From the site.





